Nev, Donald, and others having tri gear concerns.

Nev is right that the gap is really not that much of a concern 
especially at 5-8 mm.   Organizing the project for efficiency of work 
comes with practice.

The adjustment of the height of the fuselage to gear plane is one 
excellent way to make and adjustment to the fit.  Just don't get too 
carried away, keep it close to the vertical distance in the book, which 
keeps the tail from being too low (nose gear higher means banging it 
more often) or too high which increases the camber angle making tire 
wear increase.

I do bend the flanges a bit to allow me not to have to use as much 
Redux.  Then just bond it in.

Unlike Nev, I prefer to glue in the cleaned and dimpled metal sockets 
first and allow to cure, then  put in Rib one the next day.  If working 
alone, I put in both rib ones and let them partially cure, getting a 
long coffee break.  If working with an assistant, we return when the 
ribs are firm and apply Aeropoxy or Ampreg flox to fill the gaps at the 
walls and smooth our Redux job a bit and apply more Redux to the leg 
face for a good bond and follow with the number one layups. If we are 
making good time, we lay on rib two with Redux then take a quick lunch 
break.  We come back and while the Redux is a bit sticky but the rib is 
in firmly, we lay in more flox and glass it up.  Then I allow it to cure 
with a bit of peel ply.  That makes for a really long day though.

However, if you're not on with your glassing MOJO, as the kids say, then 
I do rib two the next day.    Of course you can gather that the one and 
two ribs are carefully cut to a tight fit and ready to install before 
hand.  In a perfect world, the next day I do the trimming of the three 
and four ribs and install them.  Your back will really need a break when 
done.   Then take the gear out and glass in the bottom.

If working alone, and if the top is on already, work gets slowed down a 
bit, so one rib a day is normally the rule.  It is getting winter time, 
so heating of the project is necessary so it also tends to slow the 
project a bit.

>From start to finish, one week to get the plane level and set, ribs in 
and legs on.  That leaves the next week to get the wheels and brakes in 
and operating, and the plane rolling.  Week three is needed for the 
wheel pants and such.  Then you need a much deserved break but only a 
short one, as there is more to do.  Getting the monowheel hole closed up 
and figure how to get a lower access hole installed and fuel lines 
cleaned up and accessories in that big old cockpit module hole.

Regards,
Bud Yerly
  ----- Original Message ----- 
  From: Neville Eyre<mailto:neveyre@aol.com> 
  To: europa-list@matronics.com<mailto:europa-list@matronics.com> 
  Sent: Sunday, November 25, 2012 3:57 AM
  Subject: Re: Europa-List: tri gear socket installation


  Hi Donald,
  1/2'' to 5/8'' gaps betwen the socket flange and the outer skin is not 
unusual, I could never work out where the variation came from ?
  Most important is the ST 70 dimension.
  Then ensure the track is true with the legs clamped to an angle 
straight edge.Take measurements from tailplane torque tube ends to check 
this.
  Then ensure the horizontal datum of the angle aligns with the 
aircrafts horizontal datum [ tailplane torque tube / wing spar bushes ].
  Then check the lateral position from the aircrafts centre line [ also 
check the positive camber of the axle shafts and adjust [ worsen] the 
side to side positioning to get the camber of the shafts nearer to each 
other.
  Forget about closing up the gap between the socket flanges and the 
fuselage skin.
  If you can close up the gap [ dropping the fuselage ] without 
buggering up any of the other parameters, well and good, otherwise go 
for it and use a thick Redux pad in the gap. I have slipped in some 
plywood shims to bulk out the gap if it as large as you describe [ Redux 
is expensive, slivers of wood will be free !]
  Other things I do different, the lay up of the socket to Rib 1, don't 
smear Redux on the socket and do the lay up with Ampreg, do a HOT Redux 
lay up in 1 ply of Bid, 2'' onto each side of the Rib around the socket, 
peel ply and let cure. Then do the lay ups as per Manual.
  Do a hot Redux lay up on the outer face of the socket flange, peel ply 
etc, before doing the 2 Bid lay up on to the skin. Do the hot Redux lay 
ups onto plastic sheet, wet out well, then slap it on like an 
elastoplast !
  Ampreg doesn't stick too well to steel, and I don't like messing with 
two different epoxy systems  going wet on wet ?
  Cheers,
  Nev.


  -----Original Message-----
  From: fireflier <fireflier@btinternet.com>
  To: europa-list <europa-list@matronics.com>
  Sent: Sun, 25 Nov 2012 1:04
  Subject: Europa-List: tri gear socket installation


<fireflier@btinternet.com<mailto:fireflier@btinternet.com>>

Hello

Today I have been busy trial fitting my gear sockets. but I have got a 
problem 
and wondered if anyone has experience this during building and how they 
have 
overcome it?

After taking my time setting everything up as per the build manual I 
inserted 
the gear legs and sockets into the holes clamping the axle's in position 
against 
angled bar with the axle center line on fuselage station 70 and the axle 
end 
36.75' from the fuselage center line.  With all this set up the socket 
flanges 
are approx 13 - 15 mm of the fuselage.

I tried altering the fuselage underside to ground height but this made 
very 
little difference to the distance between socket flanges and the 
fuselage.  I 
managed to get the gap down to approx 5-8mm by reducing the fuselage 
underside 
to ground height to 395mm, this is very different to the 413mm quoted in 
the 
build manual.

I have attached some photos showing the gap between sockets and fuselage 
and 
also the position of the socket tubes within the baggage bays when 
inserted.

Any comments or solutions to my problem would be much appreciated.

Many thanks for taking the time in trying to help me find a solution to 
the 
problems I'm experiencing.

Kind regards
Donald

--------
Fireflier


Read this topic online here:

http://forums.matronics.com/viewtopic.php?p=388820#388820<http://forums
.matronics.com/viewtopic.php?p=388820#388820>


Attachments: 

http://forums.matronics.com//files/port_axle_494.jpeg<http://forums.matro
nics.com//files/port_axle_494.jpeg>
http://forums.matronics.com//files/starboard_axle_172.jpeg<http://forums.
matronics.com//files/starboard_axle_172.jpeg>
http://forums.matronics.com//files/starboard_socket_position_in_baggage_b
ay_539.jpeg<http://forums.matronics.com//files/starboard_socket_position_
in_baggage_bay_539.jpeg>
http://forums.matronics.com//files/starboard_leg_socket_188.jpg<http://fo
rums.matronics.com//files/starboard_leg_socket_188.jpg>
http://forums.matronics.com//files/port_socket_position_in_baggage_bay_88
6.jpg<http://forums.matronics.com//files/port_socket_position_in_baggage_
bay_886.jpg>
http://forums.matronics.com//files/port_leg_socket_744.jpeg<http://forums
.matronics.com//files/port_leg_socket_744.jpeg>


_blank>www.aeroelectric.com
/" target=_blank>www.buildersbooks.com
=_blank>www.homebuilthelp.com
blank>http://www.matronics.com/contribution
arget=_blank>http://www.matronics.com/Navigator?Europa-List
p://forums.matronics.com


www.aeroelectric.com<http://www.aeroelectric.com/>
www.buildersbooks.com<http://www.buildersbooks.com/>
www.homebuilthelp.com<http://www.homebuilthelp.com/>
http://www.matronics.com/contribution<http://www.matronics.com/contributi
on>
http://www.matronics.com/Navigator?Europa-List<http://www.matronics.com/N
avigator?Europa-List>



<Prev in Thread] Current Thread [Next in Thread>