europa-list
[Top] [All Lists]

RE: Europa-List: Another Mod 72 complete

Subject: RE: Europa-List: Another Mod 72 complete
From: rick <rick@amimotormanagement.co.uk>
Date: Tue, 13 Mar 2007 11:00:57
No problem for me. I did mine on my Tri on Sunday and took about 4 hours
including cleaning up around the bulkhead whilst the engine was forward and
the exhaust off. 

So concentrating about the mod (and Spurs playing Chelsea) that I forgot to
check my E Mails for Paddy's DOTH at Panshanger - drat. I hope you guys
enjoyed it.  


Rick 


   _____  

From: owner-europa-list-server@matronics.com
[mailto:owner-europa-list-server@matronics.com] On Behalf Of William
Harrison
Sent: 13 March 2007 09:26
Subject: Re: Europa-List: Another Mod 72 complete


Hi Bob and everyone 

Is there room to do Mod 72 with the engine on a sling but still attached to
its oil/coolant lines?

Cheers

Willie Harrison G-BZNY


On 12 Mar 2007, at 22:38, rlborger wrote:


Fellow Europaphiles, 

Another Mod 72 completed.  Preparing for the Mod took much longer than
performing it.  Pics have been posted on my build web pages (URL in
signature block).  The reamer will go off to Ron P. first.  Upon return of
the reamer, I will let folks know.  I'll have a little kit consisting of
reamer and a can of self-etching primer ready to ship to the next person
ready to perform the mod.  I am not including the ACF-50 as I think that
everyone should have a can of their own as it needs to be re-applied with
each annual inspection  The kit will go to the first person to contact me
with a shipping address.  I expect that they will let the Forum know when
they have completed Mod 72 and will pass it on.


Good building and great flying,
Bob Borger
Europa Kit #A221 N914XL, XS Mono, Intercooled 914, Airmaster C/S
HYPERLINK
"http://www.europaowners.org/N914XL"http://www.europaowners.org/N914XL
(85%) tail kit done, wings closed, cockpit module installed, pitch system
in, landing gear frame in, rudder system in, outrigger mod in, Fuselage Top
on, lift/drag/flap pins in, wing incidence set, tie bar in, flap drive in,
Mod 70 done.  Baggage bay in.  Flaps & Main Gear complete.  Working in - 24
Instrument Panel, 25 Electrical, 30 Fuel System, 32 Tail, 34 Door Latches &
35 Doors, 37 Finishing.  Airmaster arrived 29 Sep 05.  Seat arrived from
Oregon Aero.  E04 interior kit has arrived and is being installed.  Waiting
on Mod 72 to resume installing the ROTAX 914.
3705 Lynchburg Dr.
Corinth, TX  76208
Home:  940-497-2123
Cel:  817-992-1117


href="http://www.matronics.com/Navigator?Europa-List";>http://www.matronics.c
om/Navigator?Europa-List

href="http://forums.matronics.com";>http://forums.matronics.com


"http://www.matronics.com/Navigator?Europa-List"http://www.matronics.com/Nav
igator?Europa-List


08:41 

-- 
08:41



<Prev in Thread] Current Thread [Next in Thread>